- Sunday, August 22
- Friday, August 20
- Wednesday, August 18
- Tuesday, August 17
- Monday, August 16
- Sunday, August 15
- Sunday, August 15
- Saturday, August 14
- Friday, August 13
- Thursday, August 12
- Wednesday, August 11
- Tuesday, August 10
- Monday, August 09
- Monday, August 09
- Sunday, August 08
- Saturday, August 07
- Friday, August 06
- Friday, August 06
- Thursday, August 05
- Thursday, August 05
- Wednesday, August 04
- Tuesday, August 03
- Monday, August 02
- Monday, August 02
- Sunday, August 01
- Sunday, August 01
August 2010
July 2010
After successful engineering dives with both Jason and Sentry yesterday, we are preparing for the first science dives of the cruise. Both vehicles will be deployed at the same site, and this requires careful planning and communication while both vehicles are in the water. The 500 m deep site that Jason and Sentry will survey today is the proposed location of an uncabled mooring (the deepest of three moorings) that will be part of the Grays Harbor Line, a component of the Ocean Observatories Initiative’s Coastal Scale Nodes. The main goals of the dive are to 1) obtain high-resolution bathymetery of the target site where the proposed Coastal Scale Nodes moorings will be deployed at ~500 m; 2) test the CHIRP system on Sentry that provides visualization of the subsurface sediment layering, faults, etc to ~ 75 m beneath the sea floor; and 3) obtain direct visual imagery and documentation of the area. This site is located on a small platform within an arcuate-shaped basin on the northern side of Grays Canyon. Sentry will be deployed first and will begin high-resolution mapping with the RESON sonar and CHIRP. Following assurances that Sentry is safely working, Jason will then be lowered and begin a survey up slope.