Node Installations Complete!
Dennis Manning
Chris Hoyt
Six on the Seafloor
Shore Station Activities
New Seg. 7 Installation
Defining the SIA
PN5A Successfully Deployed!
PN 5A – Jointing Operations
PN 5A Installation Continues
On Site to Install PN5A
Transit to Node 5A
Job Opening with OOI RSN at UW
Port Call in Portland
PN1D is Installed!
GeekWire story about node installation
Burial and Inspection Completed
Humpbacks Visit
Cable Burial Node PN1C
Milestone: PN1C is Installed
Photos of Final Inspection of PN1B
Another RSN Node is Born!
On tsunami forecasts, greenhouse gases from the ocean floor, and living under the sea
Underwater 'electrical outlets' put in place for cabled ocean observatory project