This drawing shows the Segment 1 and 2 cable routes in their temporary and final configurations. The cable routes shown in red (temporary) were installed during the summer of 2011. This year, we are recovering the “red” cable ends and relaying the cables along their final routes (shown in black). The primary node 1A (PN1A) will be installed at the base of the continental slope, near the subduction zone and to the west of Hydrate Ridge. Drawing courtesy of L-3 MariPro