- Sunday, August 19
- Friday, August 17
- Thursday, August 16
- Wednesday, August 15
- Monday, August 13
- Saturday, August 11
- Friday, August 10
- Wednesday, August 08
- Monday, August 06
- Saturday, August 04
- Thursday, August 02
- Wednesday, August 01
- Tuesday, July 31
- Monday, July 30
- Sunday, July 29
- Saturday, July 28
- Friday, July 27
- Thursday, July 26
- Monday, July 23
- Friday, July 20
- Thursday, July 19
- Tuesday, July 17
- Monday, July 16
- Saturday, July 14
- Friday, July 13
- Thursday, July 12
- Wednesday, July 11
- Saturday, July 30
- Friday, July 29
- Sunday, July 24
- Saturday, July 23
- Friday, July 22
- Thursday, July 21
- Wednesday, July 20
- Monday, July 18
- Sunday, July 17
- Saturday, July 16
- Friday, July 15
- Thursday, July 14
- Wednesday, July 13
- Tuesday, July 12
- Monday, July 11
- Sunday, July 10
- Sunday, July 10
- Saturday, July 09
- Thursday, July 07
- Tuesday, July 05
- Sunday, July 03
- Friday, July 01
- Thursday, June 30
- Wednesday, June 29
- Tuesday, June 28
- Monday, June 27
- Friday, June 03
- Wednesday, June 01
August 2012
July 2012
April 2012
March 2012
January 2012
October 2011
September 2011
August 2011
July 2011
June 2011
March 2011
February 2011
October 2010
June 2010
May 2010
April 2010
A successful Critical Design Review (CDR) for the RSN Secondary Nodes subsystem took place at the University of Washington's Applied Physics Laboratory on November 21, 2011. The 30 participants in this CDR included representatives from NSF, the Consortium for Ocean Leadership, other OOI Implementing Organizations, RSN Project Management and Science, and, of course, the engineers involved with work on this subsystem. Several out-of-town participants joined via WebEx.
Bridge Between Instruments and Primary Infrastructure
The Secondary Nodes serve as the bridge between the RSN instruments and the Primary Infrastructure. Comprised of low- and medium-power junction boxes and low-voltage nodes, these components convert the 1 Gb/s bandwidth and 375dc voltage from the Primary Nodes to the native interfaces needed by the scientific instruments. Each Junction Box provides up to eight instrument ports that can be configured for 12, 24 or 48V and 10/100BASE-T, RS232 or RS485 data links. Nodes can be daisy-chained, thereby creating extensive expansion capabilities. Some instruments will be directly connected to the Node's seafloor frame; others will be attached to the Node using connectors that can be mated underwater at depths of up to 3000m using an ROV.
Working Prototype Demonstrated
RSN successfully passed the CDR, according to Mike Harrington, the APL senior engineer leading the work on the secondary nodes. The Technical Data Package-- including mechanical models, drawings, printed circuit board schematics, software design, material choices, and heat and pressure analysis--was presented to and reviewed by the attendees during the day-long review. A working prototype system was demonstrated at the RSN Laboratory in Ben Hall on the UW Seattle campus.
Installation and Maintenance Using UNOLS Vessels
This subsystem is designed to be installed and maintained using UNOLS Global Class vessels such as the R/V Thompson and an ROV. The Secondary Node's seafloor frame footprint measures 4' by 8' (see photo at top of this story). Successful deployment testing of a full-size frame from the deck of the R/V Thompson took place during the VISIONS '11 cruise in August 2011.
Next Steps
Next up for the Secondary Nodes is the Test Readiness Review (TRR), when the first article (the first completed unit) will be checked and readiness for formal testing will be assessed. Harrington expects the TRR to take place in Spring 2012. Test procedures are being finalized and machining of titanium for the secondary node pressure housings is under way (see photos).
Grade 5 titanium was chosen after conducting a review of all the possible material choices; its durability and strength are expected to last for 25 years. The forgings purchased for the secondary-node pressure housings will be trepanned, which means the cores will be removed, and those cores will then be reclaimed for other RSN pressure housings, thus reducing the overall cost to the program for titanium.